Copyrights preserved - El Attal Holding 2019

  • Grey Instagram Icon
  • Grey LinkedIn Icon
  • Facebook - Grey Circle
  • Twitter - Grey Circle

B 61. Salah Salem, El Orouba. Heliopolis. Cairo. Egypt 

19431

BUILDING FURTHER

Construction & Infrastructure 

El-Attal Construction deals with new construction, renovation and restoration of buildings used for residential, industrial, commercial and public sectors.Simply it finds that the construction and renovation work are one of the most important fields in the history of mankind and every building on earth is defiantly a piece of magic art.

Planning & Designing

In our designs,  we will bring the place you want to design to life through our screen with the 3D shots. We will help you design y our place efficiently according to the style you desire. Your home, outdoor area, office, clinic or whatever place we will help you see it and imagine it before it comes to life. 

Projects

 

From AGC vision simply it finds that the construction works is one of the most important fields in the history of mankind and every building on earth is defiantly a piece of magic art so here AGC are going to present some of the achievements and works of the company where you can see the beauty of external design of the buildings and the perfect utilization of the internal area to every unit and with the selection of most  of experts.

These fine Architectural works include a large number of Tourist Villages, Industrial Establishments, Housing Towers, International Villa Designs taking into consideration the General Coordination, the General Area, the Perfect Design and Finishing with a Distinguished Scientific Standard in the Field of Construction.

Cities and

Touristic Villages

 

Masr EI-Gadida Tourist Village

Owner: Masr EI-Gadida Building Association Area: 50 Feddans, at the North Coast.

 

Project Description:

 

The project was carried out through three stages to guarantee the Perfection and Punctuality:

First Stage:

 

The infrastructure includes:

 

  1. Water supply

  2. Power system

 

  1. Sewage system

  2. Roads and fortified areas

 

Second Stage:

 

A group of 110 villas - the surface area:

  1. 80 villas: 150m² + 100m2 gardens

  2. 30 villas: 180m2    + 100m2 gardens

 

Also includes the Main Restaurant of the Village, Mosque at Service Area, Public Gardens and Shopping Area.

Madinet Hada'ek EI-Ahram

Owner: The Cooperative Society for Housing Construction and Rehabilitation of desert.

Area: 1153 feddans about 4.842.600 m2 at Pyramids-Fayoum desert.

 

Project Description:

 

Consists of nine (9) Districts with different Architectural Design of Pharaonic Style, to serve approx. 4918 members of the Association. The expected number of Population is around 99.420.000 person i.e. 86 people per feddan.

Each Housing District consists of a group of Residential Buildings and some Villas with a distinguishing style which includes also the Road

Network, Sanitary Drainage Network, Electric Network and General Services and Facilities.

We have executed the Drawings and Plans and Road Network Plan in addition to Special Studies of Soil and Foundation for the Project.

 

Cost of Project: 110,000,000 Egyptian Pounds.

Time of Execution: 6 years.

San Beach Tourist Village

Owner: The United Group for Hotels and Tours. Area: 76500m2 at Hurghada

 

Project Description:

Executed on four (4) Stages:

First stage:

Five (5) Stars Hotel of three (3) Stories built on Surface Area of 3000m2, which include (240) Rooms and Suites, one Basement and a Ground Floor consisting of Dining Halls, Party Halls, Reception and Administrative Units.

Second stage:

(120) Chalets, each consists of (2) Rooms + Hall

+Bathroom, on a surface area of 80m2

 

Third stage:

(36) Villas each of two (2) stories including (4) Rooms + Hall +Bathroom and Kitchen on a surface area of 400m2

 

Fourth stage:

Two (2) Swimming Pools with special design.

Cost of project: 60,000,000 Egyptian Pounds Time of Execution: 40 months.

Swimming Pool Chalets

Owner: Movenpick Hotel Area: 3500m2 at Heliopolis

Project Description:

Number of Chalets each of (2) Stories and Ground Floor on the whole complete area. The First and Second Stories on an area of 2900m2 including all Service and Entertainment Facilities.

Cost of Project: 27,000,000 Egyptian Pounds. Time of Execution: 30 months.

Maxim Country New Cairo

Owner: Maxim Group

Project description: Design , build and finish maxim Country new Cairo.

Abtal 10th of Ramaban

Owner: Military Forces

Project description: Design , build and finish for 12 villas and private pool as private compound.

 

Towers and

Residential Buildings

Faylaka Tower

Owner: Mr. Salah Mekky.

Area: 985 m2

Project Description:

Housing Tower of ten (10) stories consists of Ground Floor, Mezzanine + Identical Repeated Stories and Parking Area on the total area of the building.

  • Mezzanine: Shopping Area and Administrative Offices.

  • Identical Stories:Housing Units starting from 150m2, each consists of four rooms, hall, bathroom and kitchen.

 

Cost of Project: 3.760.000 million Egyptian pounds.

Time of Execution: 30 months.

Nahed Tower

Owner: Mrs. Amina Ahmed Shalan

Area: 1000m2 at Garden City

Project Description:

Housing Tower of twelve (12) Stories (Underground, Ground Story, Parking Area, Identical Stories which including Residential Units with different areas.

Cost of Project: 5,000,000 Egyptian Pounds

Time of Execution: 3 years.

Saint Fatima Building

Owner: Mrs. Amira Omar Area: 1150m2 at Heliopolis

Project Description:

Housing Building of three (3) Stories each on an area of 650m2 consisting of four (4) Residential Units.

Cost of Project: 250,000 Egyptian Pounds.

Time of Execution: 5 months.

Al-Andalusia

Owner: Roaiee Marketing Company.

Location: El Hayuu El-Asher, Nasr City, Cairo, Egypt Area: 750 m2

Project Description:

 

Design, Construction and finishing of 12 Stories residence building residence building.

Cost of project: 1 million Egyptian pounds

Time of Execution: 12 months

Pearl of new Cairo

Owner: Roaiee Nap Contract Company. Location: New Cairo , Katmiya.

Area: 420 m2

 

Project Description:

Design, construction and finishing 5 stories residence Building.

Cost of project: 850,000 Egyptian pounds

Time of Execution: 16 months.

EI-Kamma Tower 6th of October

Owner: Roiaa Marketing Company. Location: New Cairo, Katmiya.

Area: 750m2

 

Project Description:

 

Design, construction and finishing of a 5 stories residence building.

Cost of project: 700,000 Egyptian pounds

Time of Execution: 12 months.

Mohandessin Tower

Owner: Mr. Hamed Arafa

 

Area: 950m2 at Mohandessen

 

Project Description:

Housing Tower of twelve (12) Stories, the Grand Story includes the Shopping Area, the 1st Story which includes Administrative Units + two Identical Stories each includes (3) Residential Units.

 

1st Building:

For Product Manufacturing Complex on an area of 600m2

2nd Building:

For Store and Administrative Offices on area of 450m2

Garden:

On area of 100m2

Cost of Project: 1,800,000 Egyptian Pounds.

Time of Execution: 2 years.

Syboe'e Building

Owner: Diaa' Hanem Mourad Area: 840m2 at Alexandria City

 

Project Description:

Housing Building of eight (8) Stories including Ground Floor for Shopping Area, 1st floor for Restaurant and Identical Stories each consists of (4) Residential Units.

Cost of Project: 3,400,000 Egyptian Pounds.

Pearl of EI-Mohandessin

Owner: Mrs. Amira Orfey

Area: 1200m2, Mohandessin

 

Project Description:

Apartments and Administrative Building of a twelve (12) Stories including Mezzanine + Identical Stories of Residential Units + Parking Area.

 

Cost of Project: 5,000,000 Egyptian Pounds.

Faten Hamama Tower

Owner: Mrs. Khadiga Mohamed.

Area: 850m2 at Heliopolis.

 

Project Description:

Housing Building four (4) Stories on an Area of 650m2, each Story consists of four (4) Residential Units.

Cost of the project: 450,000 Egyptian pounds.

Time of execution: 7 months.

Arbeen Tower

Owner: Mr. Sayed Refaei

Area: 750m2 at Suez City

 

Project Description:

Housing Tower of nine (9) Stories including the Ground Floor (Shopping Area) and 1st + Identical Stories consisting of (5) Residential Units + Parking Area.

Cost of Project: 3,900,000 Egyptian Pounds.

Time of Execution: 26 months.

Makkah Towers

Owner: El-Attal Group Brothers Co.

Location: Hayuu El Asher, Nasr City- Cairo, Egypt.

Area: 650 m2

 

Project Description:

To Design and Construct tower consists of Eleven (11) Floors, Ground and Roof .

 

Cost of project: 1.6 million Egyptian pounds

Time of Execution: 28 month

The Golden Tower

Owner: Mr. Ahmed Ibrahim

Location: elzamalek, Egypt

Area: 850 m2

Project Description:

Design and construct 11 floors including the Mezzanine, shopping area, landscape,

 

Cost of the project: 3 million

Time of Execution: 13months

Maddina Towers

Owner: El-Attal Group Brothers Co.

Location: Hayuu El Asher, Nasr City- Cairo, Egypt.

 

Area: 800 m2

 

Project Description:

To Design and Construct tower consists of Eleven (11) Floors, Ground and Roof floors.

Cost of project: 1.9 million Egyptian pounds

Time of Execution: 30 months

Air force Hotel in Egypt

Owner: Air force

Area: 6000 m2 •

 

Project Description:

Private hotel belongs to the Air Force in Cairo consists of 200 rooms including Services and facilities and reception halls, restaurants and garages.

San George Hotel

Owner: Mamdoh Philip

Area: 4600 m2 

Project Description:

Construct International hotel of 6 floors, two floors underground in addition to the Ground floor have around 300 rooms and suites, Service units, and reception halls, restaurants and garages.

lrbil factory for shoes and leather

Owner: Mr Saleh Morsi

Area: 1500 m2

Project Description:

Construct new Factory of three building (Administrative Building on area of 200 m2, manufacturing building on area of 800 m2 and finishing building on area of 500 m2

T.T Clothes Factory

Owner: Mrs/ Tahia Tawfick

Area: 1150 m2

Project Description:

Construct factory for producing clothes

Misr Elhegaz (Administration Building)

Owner: Misr Elhegaz Group.

 

Project Description:

Design and Construct  all Factories on 10th of ramadan and also Administration office for Dr. Mohamed Helmy.

IPSOS

Project Description:

Renovate and upgrade for IPSOS third, fourth, fifth, seventh and eighth floors 

Villa Hafez

Owner: Haj / Mohammed Hafez Area: 650 m2

 

Project Description:

Design and Construct Villa consists of two floors in addition to the roof and Iron fence around the Villa.

Villa Hafez

Owner: Mr. Mustafa EI-Boghdady

Area: 950 m2•

Project Description:

Design and Construct Villa consists of two floors in addition to the roof and landscape.

Villa Nabil Abo-Taleb

Owner: Mr. Nabil Abo-Taleb

Area: 1200 m2

Project Description:

Design and Construct Villa consists of Basement, Ground floor and three typical floors in addition to the roof, landscape with swimming pool.

Prof, Yasser Abd El- Rahman residence villa

Owner: Mr. Yasser Abd El-Rahman

Area: 850 M 2

Project Description:

Design and construct Villa consist of Basement, Ground floor and two floors in addition to a roof.

Ehab Residence villa

Owner: Ehab Hafez

Area: 1400 m2

Project Description:

Design and construct Villa consist of Basement, Ground floor and two floors in addition to a roof and the landscape.

Ehab Residence villa

Owner: Ehab Hafez

Area: 1400 m2

Project Description:

Design and construct Villa consist of Basement, Ground floor and two floors in addition to a roof and the landscape.

 

Schools

Egypt 2000 School

Owner: Mrs Nermen Ismail.

Location: El Hayuu EI-Thamen , Nasr City, Cairo , Egypt

Area: 1400 m2

Project Description:

Construction, design and finishing of 3 buildings each consists of 5 floors with 3 large playgrounds and courts.

Time of Execution: 32 months

EI-Rowad Language School

Owner: M r. Adel El- Sh eikh.

Location: El Hayuu EI-Thamen , Nasr City, Cairo , Egypt

Area: 950 m2

Project Description:

Renovation and construction of two additional floors.

Time of Execution: 9 month

El- Raya Language School Hayee

Owner: Mrs. Seham El-Sheikh.

Location: El Hayuu EI-Thamen , Nasr City, Cairo , Egypt

Area: 1000 m2

Project Description:

Design and construction of 2 building each consist of 3 floors with a large playground.

Time of Execution: 18 months

Manart Heliopolis Language school

Owner: Mr.Mohammed Abd El-Salam

Location: El Hayuu EI-Thamen , Nasr City, Cairo , Egypt

Area: 1100 m2

Project Description:

Design and construction of 4 floors administration school building.

Time of Execution: 18 months.

Renovations

Public and vital Facilities

 
 

Maspero

  • Structural treatment works to some damaged  parts in El - sharifinn radio studio building.

  • Treatment of structural elements affected by fire in the following floors (26 - 27 - 28).

  • Treatment of structural elements and renovating facilities in sending center in Torah - Mansura.

International Cairo Stadium

  • Renovating the Western facade columns in the main playground.

Cooperative Association for Petroleum

  • Columns and beams treatment in washing halls in El-Nasr Station - Manshia - Alexandria.

Projects implementation association for Hydrological stations of electric power

  • Treatment and maintenance work related to power station of Aswan.

Egyptian Electricity Authority

  • Strengthening and repair workers Housing area in Abu Qir power plant.

  • Renovating and fixing cracks and making some Epoxy Painting to the floors and columns in freezing building - Canal Area.

Air Force Command Center

  • Security Towers Renovation in the Command Center.

Misr Company for distribution and Cinema

  • Structural elements Renovation in Heliopolis Cinema.

  • Structural elements Renovation in Port said Cinema.

Shepherd Hotel

  • Strengthening concrete pillars bearing of the Hotel (Stage 1)

  • strengthening the ninth floor (Stage 2).

General Authority for river transport

  • Renovation and treatment of water infiltration in Nubariya Hawes - Alexandria.

Cooperative Association for Petroleum

  • Treatment of columns and beams of washing halls in Nasr Station Manshia - Alexandria.

Ministry of Awqaf

  • Safa Building renovation in san Stefano - Alexandria.

The courts buildings

  • Renovation of EI-Galaa Courts buildings.

  • Treatment and renovation of Port Said Courts buildings.

Engineers Association

  • Strengthening the foundations of the sub organization building Alexandria

EL-Maamora for Housing & Construction

  • Treatment of EI-Ajami Area.

Misr Company for Construction

  • Renovation for Ministries Complex - Sadat City.

Muslim Youth Society

  • Renovate the main building of the Muslim Youth Society - Ismailia.

Cooperatives Authority

  • Strengthen and repair Obour Building.

 

Antique and Stone Installations

The Ministry of Culture (The Historical Cairo Project)

  • Renovation of El-ghory Agency

EL-Mhamodia General Company for Construction

  • Renovation and repair of the Islamic Affairs Supreme Council.

Arab Contractor Company

  • Injection and renovation at the following buildings (Babylon Fortress - EI-Ghory Mosque - Estadar Mosque).

El-Araby Building (1 El -Reway St, Attaba)

  • Strengthen of the stone walls and ceiling concrete works.

El-Araby Building (5 El -Reweay St, Attaba)

  • Strengthen of the stone walls and ceiling concrete works.

Fish Garden Highland

  • Renovate the highland completely on two stages and renew Aquarium, inject the cracks and Strengthening of the main dome

Church of the Virgin in Raydania - Mansura

  • Strengthen and renovate the stone walls in the church building

Church of the Mary Gerges - in Sendes

  • Renovate and strengthen the domes and inject the church's building cracks.

  • Renovate and strengthen the stone walls in the church building.

Church of the angel Gabriel

  • Renovate and strengthen the stone walls and the ceiling in the church building (because of earthquake)

Saint Mark Church - Giza

  • Strengthen the cracks in the stone walls and buildings by using iron Clips and Grawt injection and dome church injecting

Abo Bakr AI-Sedek Mosque

  • Strengthen the Mosque Minaret and the treatment of the mosque walls

Deer Abu Makar

  • Renovate some Ancient churches

Arab contractors

  • The Hanging Church and Babylon Fortress renovation

The Nile Valley Company

  • Injection Works

Mkarm EI-Akhlak Mosque

  • Renovate and strengthen of the mosque - Badran Island - Shobra.

Italian Hospital

  • Renovate and strengthen of the mosque - Badran Island - Shobra.

The Egyptian Company for Tourism Development - Haram

  • Injecting all the stones walls that have been affected.

 

Universities

and Hospitals

Al-Hussein University Hospital

  • Strengthening and renovating the emergency building

Mansura University

  • Faculty of law: Treatment of structural elements for the university building.

  • College of Pharmacy:    Treatment and repair of structural elements For Abu-Naja Section.

  • Faculty of Science: Renovate of structural elements.

  • Faculty of Dentistry: Structural treatment of the College premises.

  • Faculty of commerce: Treatment and renovate the building's concrete.

  • Renovate the main gate of the university.

Helwan University

  • Renovate and treatment of the beams and ceiling of the building.

Alexandria University

  • Faculty of Veterinary Medicine: Strengthen and maintain the faculty buildings.

  • Faculty of agriculture: Strengthen and maintain the faculty building.

  • Faculty of Science: Strengthen and renovate the beams.

  • Renovate and treatment the concrete of the university hospital.

 

Companies

and Factories

El-Nasr for Facilities and installations

  • Supply and create concrete slabs for the administrative building, General site and Technology valley

Egyptian Contractors

  • Renovate the ice Bridge body - Alexandria.

The Eastern Company for Tobacco

  • Renovate the tobacco building in wardian - Alexandria

Parko Company

  • Treatment of the beams - 6th October city.

Hassan Dora Company

  • Strengthening of the columns and making hoppers in the top of the column in the top to support the ceiling (about 160 columns) in the Pharmaceuticals factory

Hassan Alam Company

  • Renovate the Ceiling and beams in Imbaba Mills

Egyptian Company for Pharmaceuticals

  • Renovate the company branch in the eastern bab el-lok

Amar Construction Group

  • Renovate the trainee's rest house

Misr Milk

  • Renovate the company's factory buildings

Helwan Company for Machine tool

  • Renovate and support the concrete beams in the middle parts section in the B4 workshop.

  • 999 Military factory.

Misr Elhegaz

  • Renovate technical building consist of facades and landscape.

  • Renovate Administrative headquarters consist of interior paint and decoration.

Ipsos

  • Renovate 3rd and 5th floor in main branch in maadi consist of painting and decoration.

Banks

 

Alexandria bank

  • Treatment of rust and cracks in the concrete beams and walls­ main branch.

  • Treatment of rust and cracks in the concrete beams and walls in the basement - Debana Church Street.

Banque Du Caire

  • Treatment of the structure body for the stores and archives of belongs to the bank - Shbra el-khema branch.

  • Treatment and fix the basement ceiling beams in the bank - Ibrahim El-lakany branch.

  • Treatment of the structure body for the Stores and archives - Main branch

Banque Du Caire

  • Treatment of the structure body for the stores and archives of belongs to the bank - Shbra el-khema branch.

  • Treatment and fix the basement ceiling beams in the bank - Ibrahim El-lakany branch.

  • Treatment of the structure body for the Stores and archives - Main branch

Banque Misr

  • Renovate the bank beams in the Giza Branch.

Bank EI-Mohands

  • Devolving and Expanding the bank

 

Residential Buildings

Agoza Building

  • Treatment and fix the structure elements in the building

Gwaharet EI-Zamalik

  • Strengthening the foundations and the columns and some structural elements in the building

Building No (15) Giza

  • Renovate and fix the structural elements for the building

Building No (3) Dokki square

  • Strengthen the stairs broken in the building.

  • Treatment of some cracks (By injecting) using the Growth Material.

Building in street No. 684 El - Gesh Street - Alexandria

  • Strengthening beams, columns, ceiling and balconies of the building by using metal brackets

Owner Association of the building No, 9 El Sebaak Street

  • Strengthen and renovate building no.9

Ayobco Company

  • Renovate the building No, 22 by using jackets for supporting the building from the foundations to the seven floor

Residential tower Company

  • Strengthening and renovating the columns of El Kuwait Tower .

Prefabricated buildings Company

  • Treatment and renovate the Cracks and connection - 15th may.

Nasr City Company for Housing and Reconstruction

  • Strengthening and renovating the buildings No, (11, 12, 13, 14) in the Eleven zone - Nasr City.

  • Strengthening and renovating the buildings No, (15, 25) in the Six zone - Nasr City

Cairo General Contracting Company

  • Renovate and treatment of concrete jackets of the columns in the buildings No, (9, 10, 11, 12)

  • Development the fifth avenue buildings.

Nasr General Contracting Company

  • Treatment and paint the final surface for the ceiling in the project 1014 Villa EI-Seraga

 

Floors

Egypt Aluminum Company

  • Painting the anti sharpening and friction floor in the Aluminum Company

101 Armor Workshops

  • he Armor factory's flooring of the Haikasteb Workshop

The red sea General Contracting Company

  • Painting the floor using Ipoxy Materials in the Flour Show romanizationSilos - Mansura Mills

El Safa Contracting Company

  • Floors (Cut Breaks for flooring) Sibajegi Pharmaceuticals - Sadat City.

Wailer Company for Tmapat

  • Anti-friction floors

Egyptian Sugar Distillation Company

  • Rehabilitation in the Workshop in tool factory - Hawamdya.

  • Flooring the mechanical workshop in the factory - Hawamdya

Gomohoria general construction company

  • Supply Floor material and Technical supervision on the implementation of the concrete flooring

Siemens Company

  • Epoxy painting - Alexandria railway station

Arab Contractors - Alexandria

  • Make a protection layer for the concrete floors in the aluminum factory in Metras.

Islamic company for manufacturing packaging materials

  • Epoxy floorings - 6th October City

Advanced Chemical Company

  • Flooring Epoxy for the company refrigerator - the city of peace.

BARCO Company

  • Epoxy Floors for the automatic Slaughterhouse- Basateen

Holy Family School

  • Epoxy Flooring in the School

Egyptian Belgian Aluminum Company

  • Company Flooring.

Poultry Co. East

  • Flooring the Company - Bibles

Hassan Allam Company

  • Flooring the hospital gynecology and childbirth stairs

Armor workshop 101

  • Flooring the workshop of war factory - Balhaixtb.

Kimmo Company

  • Flooring company.

Al Nono Company

  • Industrial Floors for the company factories - 10th Ramadan City

 

Sanitation and water Networks

National Authority for drinking water and sanitation

  • The purification station works in Aswan.

  • The purification works in station Kom Ombo - Aswan.

  • The purification station works in Luxor - Luxor.

Ministry of Electricity and Electricity Authority Alexandria

  • The treatment Station + lifting station of the Plumbing station in Abu Qir

Nasr Company for facilities

  • The purification Station and drinking water treatment In technology valley

Nasr Company for facilities and installations

  • Installation and isolate the line Ductile 1000 - 600-mm in Hurghada Crimat water line project.

  • The supply and installation of regression lines and pumping stations to the city sewerage network - Belbes Sharkia.

Arab Contractors Company (Helwan Branch)

  • Supply and install sewage a Flexible double-Link Pottery pipes - Sewerage project in Tora

Egyptian Electricity Authority - Alexandria

  • Sewage systems, workers colony power Station + treatment plant

General Nile Company for Contracting

  • Project networks and regression lines, pumping stations and the expulsion lines of the process of casting the village Sabak- AI-Menoufiya.

Al Nasr Housing and Construction and maintenance of buildings

  • Sewerage well Treatment Process in flexible Cast Iron 300 mm Expulsion line from Area C In EI-Hadaba El Olia

Nasr Company for facilities and installations

  • Implementation of the treatment Station and drinking water treatment Compact Unit Brand Technology Valley - Ismailia governorate

 

Isolation Field

Nasr General Contracting Company (Hassan Allam}

  • Restoration and insulation of the swimming pool at the presidential palace - EL Koba.

  • Treatment the Water tanks, in housing process of Maadi Company.

Company SGE

  • Isolation and Epoxy Paint in Metro stations

Arab Contractors Company

  • Isolate and repair the top Water tank in Police Sports Federation club.

  • Restoration and insulation of the top water tank - Sadat City

  • Isolate the top water tanks Police Sports Federation

Union of Radio and Television - Maspero

  • Flooring conditioning chambers Studio "S".

  • The Renovation and treatment of radio and TV studios

Upper General Contracting

  • Strengthening and isolate the reservoir capacity 14000 m 3

  • Water Tank- Alexandria.

Atlas General Contracting

  • Renovation and insulation of 12 long water tank - Nasr City

Hasan Dora

  • Isolate (150000 m 2 with modern methods to the medicine Factory Ceiling - 10th of Ramadan

United Group

  • Isolate the City Center Ceiling in two stages

Nasr Company for Pharmaceutical Chemicals

  • Isolate Roof for the company's factories in Abu Zaabal

Misr Petroleum Company

  • Isolate the water tanks in Ghamra.

Xerox Corporation

  • Isolate the earth tanks in the company

Miser Company for distribution and cinemas

  • Isolate the structural elements of the Port Said cinema.

Alexandria Company for Petroleum

  • Isolation and maintenance of the ceiling against the rain in some facilities of the company

Companies produce 30 million eggs

  • Isolation and treatment of the upper Tank in san El hagar - EI­ Sharaia.

EMG Company 10th of Ramadan

  • Isolate and treat the company spent on 10th of Ramadan

Tora Cement Company

  • Isolation and treatment of stone crusher in the company

Tunnel Torah - Helwan

  • Isolate the tunnel under the Egypt railway - Helwan (first phase).

Egyptian Contracting Company

  • Isolation units of sewage treatment station Process in 6 October

Kuwait Food Co. - Americana

  • Isolation and make tendencies in the ceiling in the entire company

General Nile Company for bridges

  • Isolate cracks and spaces in the swimming pools in youth care center - 6th October City

Sadelmy Company

  • Treatment of Purification station tanks in Maadi housing Projects

Arab Company for Land Reclamation

  • The supply and installation of filling Material in Toshka

Joint-stock company, El Behera

  • Supply and installation of poly sulfide material and filling material in Toshka.

 

Isolation

Nasr Company for facilities

  • Isolation and flexible supply of cast-iron pipes of 600 mm diameter pipeline project creams.

Arab Contractors (Branch Canal and Sinai)

  • Packaging and insulation of pipes Ductile diameter of 600 mm water line Arish - Rafah

Egyptian Contracting (Mokhtar Ibrahim)

  • The removal of asbestos pipe line of gray water in the northern coast self-adhesive strips.

  • The removal of pipes and steel works are flooded and non­ submerged water station Kantara West.

Nasr Company for facilities and installations

  • Insulation works for Ductile Pipes for projects to improve the pressure through the streets of Salah

Civil Aviation Authority

  • isolate supply lines, pilots Airport Sharm el-Sheikh.

  • The removal of supply lines, pilots Aswan Airport.

 

Electromechanical Works

Ahli Bank (Cairo Plaza Branch)

Owner: Bank AL-Ahly

Location: Corniche EL-Nile

Project description:

Construction, Test and operate the largest datacenter on Egypt.

Ahli Bank (Shreif Branch)

Owner: Bank AL-Ahly

Location: Shrief Street.

Project description:

Design , construction and operate Sherief Branch data Center.

Arab Bank

Owner: Arab Bank

Project description:

Design, construction and operate Bank data Center

MALAYSIA

Malaysian Student’s Hostel in Abbasiah, Cairo.

Owner: The State Government of Malaysia.

Location: Abbasaiah, Cairo, Egypt.

Area: 1800 M² Per floor.

Project description:

Design , construction m renovation, renovation, repairing and completion of remedial and extra works.

Time of Execution: 32 Months

Sabah Student’s Hostel in Cairo

Owner: Yayasan of Sabah

Location: Naser City, Cairo, Egypt.

Area: 480 m² per floor

Project Description:

 

Purchasing, Design and renovation for 7 stories student’s Hostel

Time of Execution: 8 Months

Pahang Student’s Hostel in Cairo

Owner: Pahang State

Location: Naser City Cairo, Egypt.

Area: 300 m²

Project Description: Renovation, repairing and furnishing for 6 stories student’s hostel.

Time of Execution: 18 Months

Pahang Student’s Hostel in Cairo

Owner: Pahang State

Location: Naser City Cairo, Egypt.

Area: 300 m²

Project Description: Renovation, repairing and furnishing for 6 stories student’s hostel.

Time of Execution: 18 Months

Welaya Stuent’s Hostel

Owner: Welayah Perskutwan

Location: Naser City Cairo, Egypt.

Area: 320m² per floor

Project Description:

 

Purchasing, Design and renovation for 8 student’s Hostel and extra works

Time of Execution: 12 Months

Old Perak Student’s Hostel in Cairo

Owner: Perak State.

Location: Naser City Cairo, Egypt.

Area: 290m² per Floor

Project Description:

 

Repairing and Renovation for 6 stories student’s hostel 

Time of Execution:  8 Months

New Perak Student’s Hostel in Cairo

Owner: Perak State

Location: Naser City Cairo, Egypt.

Area: 310 m² per floor

Project Description:

 

Purchasing, Design, Renovation and extra works for 6 stories student hostel.

Time of Execution: 8 months.

Sabah Student’s Hostel In Alexandria

Owner: Yayasan Sabah State.

Location: Sidi Bisher , Alexandria, Egypt.

Area: 600m² per Floor

Project Description:

 

Purchasing and renovating for 7 stories student’s Hostel.

 

Time of Execution: 28 Months

Melaka New Student’s Hostel in Cairo

Owner: Melaka Government

Location: Naser City Cairo, Egypt.

Area: 380 m² per floor.

Project Description:

 

Design, Construction and finishing for 9 stories as a student’s Hostel.

Time of Execution: 12 Months

Kelantan New student’s Hostel In Cairo

Owner: Yayasan Kelantan

Location: Naser City Cairo, Egypt.

Area: 420 m² per floor

Project Description:

 

Design, Construction and Finishing for 11 stories as a student’s hostel.

Time of Execution: 24 Months

Terengganu New Student’s Hostel in

Owner: Terengganu State Government

Location: Mansoura, Egypt.

Area: 320m² per floor

Project Description:

 

Purchasing, Design, Renovation and finishing for 7 stories as a student’s Hostel.

Time of Execution:- 8 Months

Amana Raya Student’s Hostel in Cairo

Owner: Amana Raya Association

Location: Naser City Cairo, Egypt.

Area: 220 M²

Project Description:

 

Design, Renovation and finishing fir 5 stories as student’s Hostel

Time of Execution: 6 Months

Malaysian Embassy offices

Owner: Malaysian Embassy In Egypt

Location: Mohandseen, Giza, Egypt.

Project Description:

Renovation and finishing for some offices and reception inside the Malaysian embassy.

Time of Execution: 8 Months

Selangor Student’s Hostel In Cairo

Owner: Selangor State government.

Location: Hayu Ashir , Cairo , Egypt.

Area: 450 m² per floor.

Project Description:

 

Purchasing, design, renovation and finishing for 6 stories as a student’s Hostel.

Time of Execution: 10 Months

Kelantan Second Student’s Hostel

Owner: Majlis Agama Islam Kelantan

Location: Hayu Sabee , Nasr City , Cairo.

Area: 420m² Per Floor

Project Description:

 

Demolish, design, construct, finish and furnish 11 typical floors as a student’s Hostel and other facilities

Melaka Second Student’s Hostel

Owner: State Government of Melaka

Location: Hayu Sabee , Nasr City , Cairo.

Area: 440m² Per Floor

Project Description:

 

Demolish, design, construct, finish and furnish 11 typical floors as a student’s Hostel and other facilities

Pahang Student’s Hostel

Owner: Majlis Agama Islam Pahang.

Location: Hayu Sabee , Nasr City , Cairo.

Area: 300m² Per Floor

Project Description:

 

Design, construct, finish and furnish 10 typical floors as a student’s Hostel

Malaysian Ambassador Residence

Owner: Ministry of Foreign Affairs Malaysia (WISMA PUTRA) 

Location: Mohandseen , Giza, Egypt.

Area: 1900 m² Per Floor.

Project Description:

 

Design, Rehabilitation, Renovation, finishing and furnishing 4 floors as a residence for the ambassador of Malaysia in Egypt

Pahang Second Student’s Hostel

Owner: Majlis Agama Islam Pahang

Location: Hayu Sadeth , Nasr City , Cairo..

Area: 560m² per floor.

Project Description:

 

Design, Construct, Finish and furnishing 12 typical floors as a student’s Hostel and Other facilities infront of EL-Azhar Directly.

Malaysian Embassy - Consular Office:

Owner: Malaysian embassy

Location : Mohandseen, Cairo, Egypt

 

Project Description:

Renovation and finishing complete flat consist of reception, 2 offices, meeting room, 2 bat hrooms, kitchen and store

 

Area: 250 m2

Time of Execution: 1 month.

Malaysian Embassy - GPA director

Owner: Malaysian embassy

Location : Mohandseen, Cairo, Egypt

 

Project Description:

Renovation and finishing complete flat consist of reception, 2 offices, meeting room, 2 bathrooms and kitchen.

Area: 250 m2

Time of Execution: 1 month

BAHRAIN

Remedial Works for Bahrain Students' Hostel

Location: Mohandeseen District - Cairo

Owner: Ministry of education of Kingdom of Bahrain.

Area: 500m2

Project Description:

Repair, Maintenance and Renovation for entire Building The works include:

  • Sanitary and Plumbing

  • Strengthening the Roof of Some Rooms.

  • Installing Steel Roof Water and Fire Fighting Tanks.. Iv. Internal and External Painting

  • Changing all Flooring Ceramics.

  • Repair the main power and Distribution Line

Bahrain ambassador residence in Cairo

Owner: Bahrain government

Location: Mohandseen, Cairo, Egypt

Area: 1200 m2

Project Description:

Design, Renovation and finishing for 2 stories palace with a large garden area.

Time of Execution: 18 months.

UGHANDA

Uganda Embassy in Cairo

Owner: Uganda government

Location: Maadi , Cairo, Egypt.

Project Description:

 

Design, Renovation and finishing reception hall on Uganda Embassy

Embassies

 
 
 
 
CONTACT US
Contact Department: